Skip to Content

Usage Report

Vehicle: SRBC 17 Date: 27/04/2026 Location: SABI AGRI, Auvergne, France Missions: 1

Mission context

Weather

Precipitation type None
Temperature 24 °C
Sun position Zenith

Terrain

Slope 0 %
Cross slope 0 %

Sol

Texture Clay loam
Dominant particle size Stones 20-200 mm
Moisture condition Friable (optimal)

Crop

Species Radis et Carottes
Growth stage Maturity
Weed pressure 25 %
Planned operation Scraping

Adjacent environment

Tall vegetation No
Tall buildings No
Metal structures Yes
Ditch or embankment Yes
High-voltage lines No
Residential area No
School or playground No
Roads No
No-network zone No

Robot configuration

Robot weight 280 kg
Robot width 0.64 m
Tool
Tool name Bineuse 5 dents
Tool type Trailed
Tool weight 50 kg
Tool length 1.0 m
Tool width 0.64 m
Tool height 0.6 m
Total tool length 1.1 m
Working depth 0.08 m

Mission overview

Mission parameters

Task to perform Binage chardons
Trajectory Rectiligne, square turn
Working speed 1.8 km/h
Mission file Interrangboucle03.json
Geofencing enabled Yes

Organization

Workforce
Total employees 1
Surface area
Theoretical plot surface 0.08 ha
Worked plot surface 0.0984 ha
Robot-cultivated surface 0.2 ha
Plot fragmentation Consolidated (<0.5 km)

Agronomic summary

Energy per hectare 7.40 kWh/ha
Work rate 0.03 ha/h
Autonomy per battery 0.34 ha/batterie

Time tracking

Tool setup 0 min
GPS connection wait 30 min
Wi-Fi connection wait 0 min
Supervision time 30 min
Travel time 10 min
Number of restarts 3
Number of stops 10
Stop causes Sortie de trajectoire demis-tour

Work assessment

Quality appreciation Neutral
Crop damage Low
Before work — Mission 1
Before work
After work — Mission 1
After work

Performance Indicators

Agronomic

Crop species
Radis et Carottes
Growth stage
Maturity
Soil texture
Clay loam
Soil moisture
Friable (optimal)
Weed pressure
25 %
Planned operation
Scraping
Work quality assessment
Neutral
Crop damage
Low

Energy

SOC at start
62.00 %
SOC at end
74.00 %
Total discharge
53.15 %
For a battery pack capacity of: 2.54 kWh
Total energy consumed
1.35 kWh
Average power
0.17 kW
Energy per hectare
7.40 kWh/ha
Autonomy per battery
0.34 ha/batterie
Reference battery: 2.54 kWh

Work Rate

Work rate
0.03 ha/h
Area covered
0.18 ha
Worked plot surface
0.10 ha
Worked area
0.16 ha
Effective area
0.08 ha
Coverage rate
89.63 %
Average speed (km/h)
1.14 km/h
Max speed (km/h)
2.99 km/h

Economic

Electricity price
0.19 €/kWh
Labor cost per hour
18.00 €/h
Employees assigned
0
Labor cost per hectare
0.00 €/ha
Energy cost
0.26 €
Energy cost per hectare
1.41 €/ha
Total cost
0.26 €
Total cost per hectare
1.41 €/ha

Environmental

Temperature
24 °C
Precipitation type
None
CO₂ emissions
0.43 kg
Emission factor applied: 317 g CO₂ per kWh.
Plot fragmentation
Consolidated (<0.5 km)

Mission

Planned distance
1308.97 m
Performed distance
2856.36 m
Distance deviation
1547.38 m
Performed distance (%)
218.21 %
Mean lateral deviation
3.04 cm
kpi.mission.lateral_deviation_mean_cm_note
Max lateral deviation
19.86 cm
Without half-turn
Mean lateral deviation (tool)
4.58 cm
Without half-turn, tool distance: 110 cm
Max lateral deviation (tool)
19.97 cm
Without half-turn, tool distance: 110 cm
Worked rows
21

Operational

Robot weight
280.00 kg
Tool weight
50.00 kg
Total weight
330.00 kg
Energy per kg per hectare
0.02 kWh/kg/ha
Mean torque at work (% of nominal)
69.60 %
Reference nominal torque: 2.39 N·m — Number of motors: 2.

Safety

Geofencing exits
1
Time outside geofencing (seconds)
816.84 s
Time outside geofencing (hours)
0.23 h
Local emergency stops
0
Remote emergency stops
0
Bumper activations
0

Reliability

Output errors
0
Input errors
0
Battery errors
0
Motor errors
4
Cylinder errors
2
Total errors
6
Output error time (seconds)
0.00 s
Input error time (seconds)
0.00 s
Battery error time (seconds)
0.00 s
Motor error time (seconds)
0.63 s
Cylinder error time (seconds)
1178.56 s
Total error time (seconds)
1179.19 s
Error rate per hour
0.93 /h
System availability
94.91 %

Localization

Localization errors
7
Error time (seconds)
7881.59 s
Error time (hours)
2.19 h

Time

Total duration
23171.60 s
Total duration (hours)
6.44 h
Active time
6323.43 s
Active time (hours)
1.76 h
Inactive time
16848.17 s
Inactive time (hours)
4.68 h
Active time (%)
27.29 %
Inactive time (%)
72.71 %